Star Permits on the Ada and Canyon Sides
Star covers ground in both Ada and Canyon counties. The side your lot sits on decides who reviews the house, who approves the driveway and who permits a septic system. The city keeps separate plan-check coversheets for its Ada County and Canyon County homes.
Who Reviews What
- Building permit. Within city limits, the City of Star reviews the plans on either side. Outside them, Ada County or Canyon County does. In Star's impact area on the Canyon side, Canyon County zoning applies, but some Star rules, like road widths and the landscape ordinance, still apply.
- Driveway. The Ada County Highway District (ACHD) handles access on the Ada side. Highway District No. 4 handles it on the Canyon side.
- Septic. Central District Health septic permits cover the Ada side. The Southwest District Health septic program covers the Canyon side. Both start with a test hole.
- Transportation impact fees. Star, Middleton, Canyon County and Highway District No. 4 share the Mid-Star service area. The City of Star collects the fee inside city limits. Highway District No. 4 collects it in unincorporated Canyon County east of I-84 and north of the Boise River. See the Highway District No. 4 impact fee page.
We pull the parcel record before the first sketch, so the drawings go to the right office the first time.
What the City of Star Asks For
For a new home inside city limits, the City of Star residential submittal checklist calls for:
- A sewer certificate from Star Sewer & Water, if the house ties into city sewer
- A site plan with setbacks, driveway width and easements
- A soils and geotechnical report, stamped by an Idaho-licensed engineer, for any home with a basement
- Energy compliance, plus mechanical, electrical and plumbing plans
- Full 24 by 36 inch plan sheets, uploaded to the city's IWORQ portal
If the lot is in a floodplain, the city's zoning administrator comes first. Our design team draws the whole set in-house, so each piece gets planned with the house instead of chased at the end.
Fire Water Supply for Larger Homes
Star Fire Protection District reviews new homes under the Mid-Star single-family fire permit packet, which it shares with neighboring fire agencies. It sizes a home by all the occupiable space under its roof. The garage, bonus rooms, basement and covered porches or patios all count. Above 3,600 square feet, the home needs an approved water supply for firefighting.
Most homes we design fall between 4,500 and 7,000 square feet, so this rule shapes almost every Star plan. We settle the water supply early, along with a driveway at least 20 feet wide and a turnaround if the drive runs over 150 feet from the road. Rules can change, so confirm with Star Fire for your plan. We check it before the site plan is final.
Ditch Companies and Easements
Several ditch companies move water through the Star area. The city's own pathway planning names Eureka Water Company, Pioneer Ditch Company, Farmers Union Ditch Company and Middleton Mill Ditch Company. Ditch companies set their own easement rules, so we confirm them with the right company before we place the house, shop or driveway.